Metal Building Timelines Made Simple

How Quickly Can a Metal Building Be Built

Construction projects are known for their long timelines. If you’ve got a project that needs to move quickly without sacrificing quality and flexibility, then metal buildings are an excellent choice. While no two projects are alike, metal building projects are almost always faster than traditional wood construction. Here’s how a metal building can have a faster and more simple timeline.

Understanding The Metal Building Timeline

  • Planning & Design (2–6 weeks): This is an important phase where your vision takes shape. Designers, architects, and engineers may collaborate on the building layout, design, and size. From there, plans will be made, taking into consideration the construction site, building code, and local zoning laws. During this phase, the team will apply for all applicable permits.
  • Site Preparation (1–3 weeks): Once plans are approved, the team can get straight to work preparing the construction site. This could include clearing the land, leveling the ground, removal of debris, and even pouring the foundation. Thorough site preparation can help the entire construction project run smoothly.
  • Delivery of Materials (1–2 weeks): This is where using metal building construction can really save time in the project and reduce waste. Pre-engineered metal components are manufactured off-site and are shipped to your construction location. Because the team won’t need to measure, cut, and build certain components, they can move immediately to the next phase.
  • Construction & Assembly (4–12 weeks): This is where the project comes to life. During this phase, the building frame, roof, and walls can go up quickly. In fact, it is estimated that metal buildings with pre-engineered components can be erected 30% faster than traditional wooden or concrete buildings.
  • Inspections and Final Touches (1–2 weeks): During the final phase, the team will do a walk through to ensure everything is complete and all specifications have been met. Any inspections may be conducted at this time. Once approved, your building is ready to use!

From Blueprint to Building: The Simple Metal Building Timeline

In general, a simple metal building construction timeline can range from 3-6 months, from conception to completion. Your project may vary due to size, complexity, and the permitting required.

The construction speed and efficiency make metal buildings an attractive option, especially for commercial, institutional, agricultural, industrial, and recreational projects. Contact D.R. Poulin Construction Co. at 978-353-6740 for your next metal building construction project.

Our News

General Contractors Who Adapt: Metal Building Excellence

General Contractors Who Adapt: Metal Building ExcellenceAny experienced general contractor knows the unforeseen challenges that can come with any project.Even in the best of circumstances, there can be supply chain disruptions, changes in scope, and other unexpected...

read more

Designing the Perfect Metal Hobby Space for 2025 Adventures

Designing the Perfect Metal Hobby Space for 2025 AdventuresHave you ever dreamed of the perfect workshop, studio, or storage area for your hobby?If you’ve outgrown your garage or envision an entirely new space to explore your passion, metal structures are a popular...

read more

Is a Metal Building Right for Your Project?

Is a Metal Building Right for Your Project?If you’re looking for a robust and budget-friendly building material, consider using metal for your next construction project.Metal buildings continue to grow in popularity due to their durability, versatility, and...

read more