Metal Building Timelines Made Simple
How Quickly Can a Metal Building Be Built
Construction projects are known for their long timelines. If you’ve got a project that needs to move quickly without sacrificing quality and flexibility, then metal buildings are an excellent choice. While no two projects are alike, metal building projects are almost always faster than traditional wood construction. Here’s how a metal building can have a faster and more simple timeline.
Understanding The Metal Building Timeline
- Planning & Design (2–6 weeks): This is an important phase where your vision takes shape. Designers, architects, and engineers may collaborate on the building layout, design, and size. From there, plans will be made, taking into consideration the construction site, building code, and local zoning laws. During this phase, the team will apply for all applicable permits.
- Site Preparation (1–3 weeks): Once plans are approved, the team can get straight to work preparing the construction site. This could include clearing the land, leveling the ground, removal of debris, and even pouring the foundation. Thorough site preparation can help the entire construction project run smoothly.
- Delivery of Materials (1–2 weeks): This is where using metal building construction can really save time in the project and reduce waste. Pre-engineered metal components are manufactured off-site and are shipped to your construction location. Because the team won’t need to measure, cut, and build certain components, they can move immediately to the next phase.
- Construction & Assembly (4–12 weeks): This is where the project comes to life. During this phase, the building frame, roof, and walls can go up quickly. In fact, it is estimated that metal buildings with pre-engineered components can be erected 30% faster than traditional wooden or concrete buildings.
- Inspections and Final Touches (1–2 weeks): During the final phase, the team will do a walk through to ensure everything is complete and all specifications have been met. Any inspections may be conducted at this time. Once approved, your building is ready to use!
From Blueprint to Building: The Simple Metal Building Timeline
In general, a simple metal building construction timeline can range from 3-6 months, from conception to completion. Your project may vary due to size, complexity, and the permitting required.
The construction speed and efficiency make metal buildings an attractive option, especially for commercial, institutional, agricultural, industrial, and recreational projects. Contact D.R. Poulin Construction Co. at 978-353-6740 for your next metal building construction project.
Our News
Building Beyond Walls: Crafting Community in Commercial Spaces
Building Beyond Walls: Crafting Community in Commercial SpacesIn the dynamic world of commercial architecture, the utilization of metal buildings has emerged as a revolutionizing trend, giving rise to a new era of design possibilities and opportunities for spaces to...
Structural Excellence: The Advantages of Metal Buildings in Institutional Construction
Structural Excellence: The Advantages of Metal Buildings in Institutional ConstructionIn the realm of institutional construction, D.R. Poulin Construction has years of experience developing in hundreds of communities with important hubs like churches, healthcare and...
Efficiency Unleashed: The Benefits of Pre-Engineered Steel Buildings
Efficiency Unleashed: The Benefits of Pre-Engineered Steel BuildingsAt D.R. Poulin Construction, we specialize in providing our customers with carefully-crafted buildings of the highest quality for a range of commercial, industrial, recreational, and communal uses....